Restoration - phase IVThis phase will turn its attention to the inside of the building when it has dried out. Since the completion of phase 3 the humidity level inside the church has dropped from 82% to 60% which is around normal. The messiest job will be to remove all the damaged plaster and replace it. Next will be the return of the wood panels that line all of the churches walls. These were removed to protect them from the damp. Finally, a new purpose built kitchen and toilets with disabled access will be provided which will enable the church with its wonderful acoustic to host events and concerts. |